Base Station
Always check the installation to ensure the Base Station and Wind sensor is not affected by other equipment operating locally, which may not conform to current standards, e.g. radio/radar
2. Safety instructions on of your Superwind 1250. The information provided is to ensure your safety during mounting and operation, as well as for maint nance and troubleshooting. If you
The pairing process requires the wind sensor to be within 0.5 meters (1.6 ft) of the Bluetooth base station to succeed. Installing the base station below deck would place it too far from the sensor
In order to ensure safe and reliable serviceability for many years, the wind power station is to be controlled, serviced and maintained at regular intervals.
The power obtained from the wind is proportional the cube of the wind speed, and the wind speed increases with height from the ground. A 26% increase in wind speed from a higher tower will
The pairing process requires the wind sensor to be within 0.5 meters (1.6 ft) of the Bluetooth base station to succeed. Installing the base station below
When required again, the pairing process will need to be followed to pair the MHU and base station.
This manual will provide you with a good basic understanding of the operation and maintenance of this unit.
Base Station: Using the AC power adaptor (included in this set) plug it into mains supply and connect it to the 6.0V DC adaptor socket located at the side of the base station. After powering
PDF version includes complete article with source references. Suitable for printing and offline reading.